Project Timeline

CAPITAL IMPROVEMENT BOND PROJECTS
FALL 2017

River Valley High School Improvements/Renovations
Total Estimated Cost $1,250,000

  • Renovate existing library/network room to become new media technology center/internet café. Estimated Cost $230,000 (Begin Dec. 15, 2017)
    • Organize all necessary books into one area of the library, isolated from the rear wall.
    • Demolish and renovate rear wall to install access doors and glass storefront windows to lab areas.
    • Remove all carpeting.
    • Renovate existing hallway windows.
    • Add permanent power access along all walls and in flooring at select areas.
    • Install granite raised counters along wall.
    • Install LED lighting fixtures.
    • Paint entire facility.
    • Install new carpet.
    • Install booth seating and associated technology screens.
    • Install raised bar tables and seating.
    • Install modular couches and tables.
    • Renovate existing librarian counter area.
  • Renovate existing cafeteria (interior and exterior) to become internet café. Estimated Cost $200,000 (Begin May 25, 2018)
    • Renovate exterior shade covers.
    • Renovate exterior seating.
    • Renovate interior tile.
    • Renovate bathrooms.
    • Add electricity access along perimeter walls and select interior locations.
    • Install new booth seating and associated technology screens.
    • Install raised bar tables and seating.
    • Install low tables and seating.
  • Renovate/expand Weight Room. Estimated Cost $25,000 (Begin Sep. 1, 2017)
  • Construct new synthetic surface track. Estimated Cost $655,000 (Begin May 25, 2018)
    • Obtain engineering- August, 2017
    • Procure contractor- September- October, 2017
    • Local readjustment of football field irrigation and associated re-excavation and grading crown and slope of field adjacent the track.
  • Exterior paint refresh, interior hallway renovations, miscellaneous bathroom renovations. Estimated Cost $100,000 (Begin May 25, 2018)
  • ***New- Construct new snack bars/restroom facilities at softball and baseball fields. Estimated Cost $25,000 (Begin Oct. 1, 2017)
  • ***New- Construct new north entrance gate and seating area near snack bar of football/soccer stadium. Estimated Cost $5,000 (Begin Sep. 1, 2017)
  • ***New- Construct sand volleyball courts on east and west side of auditorium. Estimated Cost $10,000 (Begin Nov. 1, 2017)

Mohave High School Improvements/Renovations
Total Estimated Cost $1,250,000

  • Construct 1,000 square foot Reception Area/New Office on the east side of the existing library/network room. Estimated Cost $100,000 (Begin Dec. 15, 2017)
  • Renovate existing library/network room and GCA offices to become new administrative offices, counseling offices, book store, mailroom, etc. Estimated Cost $250,000 (Begin Dec. 15, 2017)
  • Renovate existing administrative offices, counseling offices, book store, mailroom, etc., to become new media technology center/internet café. Estimated Cost $220,000 (Begin May 25, 2018)
  • Renovate existing cafeteria (interior and exterior) to become internet café. Estimated Cost $250,000 (Begin May 25, 2018)
  • Resurface track (up to three layers) Estimated Cost $170,000 (Begin May 1, 2018)
    • Obtain engineering- August, 2017
    • Procure contractor- September- October, 2017
    • Demo existing surface and construct new surface- November, 2017-February, 2018
  • Athletic locker room renovations. Estimated Cost $150,000 (Begin May 25, 2018)
  • Renovate weight room, exterior paint refresh, interior hallway renovations, miscellaneous bathroom renovations. Estimated Cost $100,000 (Begin May 25, 2018)
  • ***New- Construct sand volleyball courts on south side of football/soccer stadium. Estimated Cost $10,000 (Begin Nov. 1, 2017)

Colorado River Schools Field House
Total Estimated Cost $32,500,000

  • 6,500 square feet of conference/meeting space which can be divided in up to seven (5) smaller meeting rooms.
    • Two large rooms will be dedicated technology classrooms for CTE/DE courses.
  • Indoor Soccer/Football Field with synthetic turf
  • Modular snap-lock flooring to cover synthetic turf
    • Up to eight (8) full basketball courts
    • Up to 16 volleyball courts
    • Curtains to divide the space up to sixteen (16) smaller “rooms” for staff developments, academic meetings, concerts, decathlons, Olympics, science Olympiads, etc.
  • Prefab concrete risers seat up to 5,000 in permanent coliseum, up to 3,000 more in modular seating around perimeter and on the floor.
  • Permanent home locker rooms for River Valley and Mohave High Schools.
  • Eight smaller locker rooms for tournaments.
  • Four (4) large spectator restrooms.
  • Four (4) concession stands (2 for MHS, 2 for RVHS).
  • One large commercial culinary kitchen.
  • One large state of the art media/technology center.
  • Four state of the art athletic training rooms.